3 in 1 CT 250A/5A 25mm Opening 35mm Centres RJ12 3m Lead Bovara
Bovara 3 in 1 metering current transformer features 250A/5A ratio, 100mA output, 25mm opening, 35mm centres and 3m RJ12 lead. Ideal for CT-connected energy meters.
Sign in
Please login to continue to your account.
Alternatively Known As: Three-Phase Current Transformer, 3-in-1 Metering CT, 250/5A CT, RJ12 Current Transformer
- Primary Current: 250A
- Secondary Output: 5A
- Configuration: Three-phase, 3-in-1 moulded current transformer
- Accuracy Class: Class 0.5
- Aperture: 3 x 25mm openings
- Aperture Centres: 35mm phase centres
- Insulation Voltage: 600VAC
- Dielectric Strength: 2.5kV at 1mA for 1 minute
- Phase Angle: Less than 2° at 50% rated current
- Connection: RJ12 provision
- Lead Length: 3m
- Compatible Meter: Bovara PEM400CTRJ
- Mounting: DIN rail, busbar or metal-foot mounting
- Dimensions (H x L x W): 80mm x 105mm x 38mm
- Weight: 1.2 kg
- Combines three current transformers in one compact moulded housing
- 250A primary to 5A secondary metering ratio
- Class 0.5 metering accuracy
- Three 25mm conductor apertures with 35mm phase centres
- RJ12 connection for simplified meter wiring
- Suitable for CT-connected energy meters
- Compact design for commercial and industrial switchboards
- Installation and connection must be performed by a licensed electrician in accordance with the meter manufacturer's instructions, applicable network requirements and AS/NZS 3000. Isolate the primary conductor before installation and never leave the CT secondary open-circuit while the primary is energised.
- CT-connected energy meters
- Three-phase energy monitoring
- Commercial switchboards
- Industrial power monitoring
- Electrical distribution boards
- Metering panels
- AS 61869.1:2021 – Instrument transformers, general requirements
- AS 61869.2:2021 – Additional requirements for current transformers
- AS/NZS 3000:2018 – Wiring Rules for associated electrical installation work
- Enables energy monitoring that can help identify inefficiencies and reduce unnecessary electricity consumption
- Three-in-one construction reduces component count and installation material use
- Durable moulded construction can extend service life and reduce replacement waste
A specific warranty period is not published for this product. Warranty claims are subject to Bovara's standard Conditions of Sale.
Available through authorised Bovara distributors in Australia.
