Ocular Active Load Control Service 51-250 Chargers Fee Ocular
Designed for electrical load management across sites with 51 to 250 connected EV chargers. Supports active load control technology to optimise electrical load distribution and improve system efficiency. Installation and configuration should be completed by a qualified electrical professional in accordance with AS/NZS 3000 Wiring Rules. Scroll down for service details, installation requirements, and technical specifications.
Sign in
Please login to continue to your account.
Alternatively Known As: Active Load Management Service, Load Control System for Chargers, Ocular Load Control
- Active load control technology
- Compatible with 51-250 chargers connected
- Enhances electrical system efficiency
- Dimensions (H x L x W): 150mm x 400mm x 300mm
- Weight: 5 kg
- Active load control for efficient energy management
- Supports connection of 51 to 250 chargers
- Optimizes electrical load distribution
- Installation and configuration should be performed by a qualified electrical professional to ensure compliance and optimal performance.
- Load management for electrical systems with 51-250 chargers connected
- Commercial and industrial electrical load control
- AS/NZS 3000 – Wiring Rules (Electrical Installation)
- Reduces energy waste by optimizing load distribution
- Supports sustainable energy usage and reduces peak demand
Standard manufacturer warranty applies. Please consult Ocular for specific warranty details.
Ocular Active Load Control Service for 51-250 Chargers is available now for immediate purchase. Ideal for commercial and industrial electrical load management applications.
Q: What is this Ocular Active Load Control Service used for?
A: It provides active load management for electrical systems with 51 to 250 connected EV chargers, helping optimise electrical load distribution.
Q: Is this a physical product?
A: No. This listing is for an active load management service fee rather than a physical product.
Pair this service with an EV load management system for 24 charge points when planning scalable EV charging infrastructure.
Add an EV load management kit for 24 charge points to support installation and network integration requirements.
An EV load shedder can complement managed charging installations where electrical demand requires controlled load allocation.
Understand how commercial EV charger selection influences load management planning for larger charging sites.
Register for a trade account to access exclusive pricing on this and other electrical products.
